EKO-CKS Multi Plus

🔥 Available powers

EKO-CKS Multi Plus – Powerful and automated biomass heating

Steel hot water boilers EKO-CKS Multi Plus, with a nominal heat output of 170 to 580 kW, are intended for burning with wood chips and pellets and are ideal for heating medium and larger buildings. They are suitable for installation in closed and open central heating systems.

Thanks to fully automated operation, they provide the user with a high level of comfort and reliability. The boilers are equipped with a movable grate on which the fuel burns, a lambda probe for precise combustion control, an automatic fuel injection and ignition system, thermal protection, automatic ash removal from the combustion chamber, a cyclone for extracting particles from flue gases, and return line protection.

They are recognizable by the successful combination of modern technology and quality materials, and their simple installation and use make them a safe, efficient and long-lasting solution for biomass heating.

EKO-CKS Multi Plus
  • ENVIRONMENTALLY FRIENDLY

    ENVIRONMENTALLY FRIENDLY

    Serial built-in cyclone for extracting particles from flue gases.
  • ECOLOGICAL ENERGY SOURCE

    ECOLOGICAL ENERGY SOURCE

    Intended for burning with wood chips and wood pellets.
  • AUTOMATICS

    AUTOMATICS

    The automatic operation of these systems provides the user with enviable comfort and makes these systems suitable for wide application.
  • EXTENSIONS

    EXTENSIONS

    Various additional equipment for specific purposes: CM2K, CMNET (cascade manager), CAL, CM-GSM (alarm notification and turning on/off the boiler via SMS), etc.

Product characteristics

  • Fuel type and standards: the boiler is class 5 and designed for firing wood chips of classes A1 and A2 (P16S–P31S / G30–G50) with a moisture content of W20–W35 / M20, in accordance with the EN ISO 177225–4 standard, and wood pellets of class A1 according to the EN ISO 177225–2 standard.
  • Installation purpose: it is intended for installation in closed or open central heating systems, which makes it suitable for different types of buildings and systems.
  • Adaptation to work with different fuels: in the event of a change in the type, size or moisture of the fuel, it is necessary to correct the system operation settings. There is a possibility of pre-setting parameters for individual fuel types, which ensures optimal operation.
  • Power supply: the boiler requires an electrical voltage of 380/400 V, which corresponds to a three-phase connection.
  • Connection to the heating installation: the boiler must be connected to a storage tank with a minimum volume of 12 liters per kW of rated output (max. operating temperature 95 °C) or to a hydraulic diverter (max. operating temperature 80 °C), depending on the configuration of the heating system.

EKO-CKS Multi Plus

Boiler parts and condition upon delivery

Mandatory additional equipment:

  • Transporter 2 (for wood chips or wood pellets)
  • Return flow protection

 

Additional equipment:

  • Wood chip or pellet mixer with screw conveyor for the room
  • Wood chip tank with mixer, 2m screw conveyor and electric motor drive
  • Extension of the wood chip or pellet mixer conveyor
  • Automatic cleaning system for heat exchanger flue pipes
  • Automatic ash removal system from the flue chamber (with a coil)
  • Accumulation tank
  • Additional connection for the accumulation tank
  • Module for two heating circuits CM2K
  • Room corrector CSK
  • Alarm module CAL
  • Communication module CM-GSM
  • Cascade manager CMNET
  • CM WiFi box (Internet boiler operation monitoring) or Profibus module
  • Ash conveyor - TP-3M/9M/3000L-Multi Plus 340-580 (only for Multi Plus 340/450/580)
  • Boiler with door and burner
  • Transporter 1 with motor and gearbox
  • Fuel supply box (between Transporter-1 and Transporter-2) with flame-return valve (standard delivery) or metering valve (special order)
  • Transporter 2 with motor and gearbox
  • Cyclone
  • Cyclone fan
  • Boiler - cyclone 1/2 connection
  • Boiler - cyclone 2/2 connection
  • Water tank support
  • Water tank (1 or 2 pieces, depending on boiler output)
  • Ash box
  • Automatic cleaning system for heat exchanger flue pipes (if ordered, additional equipment)
  • Electrical distribution cabinet
  • Boiler control with touch screen
  • Thermal insulation and sheet metal cladding for cyclone fan and flue element flanges (in a cardboard box)

Internet supervision and management of the boiler (with Cm-WiFi box)

Access

Easy and fast access to the web portal – anytime, anywhere! Use your smartphone, tablet or computer to intuitively read and adjust values through a modern graphical interface.

4.3" Touch screen

  • Multifunctional digital regulation for precise control of the boiler
  • The 4.3" color screen enables clear and intuitive interaction
  • Direct control over the content displayed on the screen
  • Simple and intuitive management of boiler operation